Extension of the warehouse at the brewery in Sopron, step 1 and 2

Industrial buildings

Principal: Heineken Hungária Sörgyárak Zrt
Projekt: The warehouse of the operating facility in Sopron was expanded in two parts. A hall was built from a prefabricated reinforced concrete construction and trapezoidal sheet metal cladding with 1,600 + 850 m2 of floor space, industrial floor, 4 automatic truck docking points, oversized sectional doors and 470 m2 of open loading area. To serve the docking points, an asphalt and paved road with 1,500 m2 including a new supply network and lighting was built outside the hall.

Copyrights © 2019 Stettin Hungaria | Impressum | Privacy Policy | WhistleblowingWebsite: Webpole