Extension of the Petőfi Sándor public school in Mór
Principal: Local Government Mór
Project: Our scope of services included the construction of a new two-story school over a basement. The masonry was made with 38-heights load-bearing brick walls including pillar reinforcement, after which a 26 cm thick hollow plank ceiling with a 9.3 m span was placed. The roof is made of wood with a sheet metal cover. A total of 8 classrooms and a staff room were created, social rooms are on each floor. The building is completely handicapped accessible, an elevator has also been installed. A seepage tank was moved in the courtyard to collect rainwater. A stage was also set up in the courtyard. The building has received 10 cm mineral wool insulation.