Industrial buildings
IKEA Sopron façade reconstruction office building
Principal: IKEA Industry Magyarország KftProject: Façade reconstruction on 700 m2 including replacement of adjoining doors and windows; flat roof insulation on 1400 m2ANY QUESTIONS? CONTACTSOPRON+36 99 513 290sopron@stettin-hungaria.huH-9400 Sopron, Somfalvi út...
New social building in Fertőszentmiklós
Principal: Wolf Plastics KftProject: 202 m2 prefabricated reinforced concrete ground floor building with: bathroom, changing room and dining room for 92 people.41 m2 canopy, 82 m2 smoking area. The building will have a PVC insulated flat roof, masonry structure and...
New warehouse on our site in Sopron
Principal: Own investmentProject: Construction of 1100 m2 warehouse with prefabricated reinforced concrete frame structure, sandwich panel facade; ventilated.ANY QUESTIONS? CONTACTSOPRON+36 99 513 290sopron@stettin-hungaria.huH-9400 Sopron, Somfalvi út 14BUDAPEST+36 1...
New incubation house for small businesses in Sopron
Principal: Sopron Holding Vagyonkezelő ZrtProject: FÉSZ-STETTIN consortium1979 m2 reinforced concrete frame industrial hall - with 16 workshop units, sandwich panel siding, trapezoidal sheet insulated roofing, PVC rainwater insulation, overhead lighting, industrial...
Renewal hydroelectric power plant, Alsószölnök
Principal: Jank Magyarország Kft Project: The hydropower plant built in the 1980s on the Austrian-Hungarian border on the Raab was renovated on behalf of the Austrian owner in order to increase capacity. The prerequisite for the feasibility of the project was - for...
High-bay warehouse, Szada
Principal: Ober Lízing Kft Project: The high-bay warehouse was built at the Mondi Szada Kft site as an extension of the existing plant. The main features of the high-rise building: foundation with drilled pile foundations, base of monolithic reinforced concrete,...
MTD warehouse, Nemesvámos
Principal: MTD Hungária Kft Project: Construction of a warehouse, main features: precast reinforced concrete building frame on reinforced concrete point foundations with steel reinforcements, steel-reinforced Kingspan IPN-filled sandwich panel with facade shell,...
STETTIN-HUNGARIA formwork production hall
Principal: Own investment Project: Due to the expansion and development of the production capacity, the existing 551 m2 hall was expanded. The new hall was built as a continuation of the existing hall with the same span and usable height that is connected to the old...
Facade renovation of the engine workshop for GYSEV in Szombathely
Principal: GYSEV Zrt Project: As part of a public procurement procedure, our company was awarded the contract to renovate the facade of the Lower Motor Workshop in Szombathely.The building at Szombathely station is owned by GYSEV, where locomotives are currently being...
Weninger winery in Sopron-Balf
Principal: Wenginger Kft Project: The client is Weninger Franz from Austria, who had wineries in the Sopron wine region. The winery is located in Balf and was built in incisions on sloping terrain. The function is based on the barrel store practically sunk in the...
General construction logistic hall, part 1
Principal: HUNCARGO Zrt Project: The hall with 5,000 m2 is 10 m high and made of precast reinforced concrete construction with sandwich panel cladding and flat roof, single-storey. The hall is filled with goods via 3 docking gates and 1 conventional gate each.ANY...
General construction logistic hall, part 2
Principal: HUNCARGO Zrt Project: The hall with 5,000 m2 is 10 m high, made of precast reinforced concrete construction with sandwich panel cladding and flat roof, single-storey. The hall is filled with goods via 8 docking gates and 2 conventional gates.ANY QUESTIONS?...
Extension of the component production house and construction of a new warehouse
Principal: ROTO-ELZETT CERTA Vaslatgyártó és Kereskedelmi Kft Project:Phase 1: The service includes a spare parts production hall and workshop and a two-storey office block on a total of 3,800 m2 and an open loading yard with 970 m2. The foundations were made with...
Extension of the warehouse at the brewery in Sopron, step 1 and 2
Principal: Heineken Hungária Sörgyárak Zrt Projekt: The warehouse of the operating facility in Sopron was expanded in two parts. A hall was built from a prefabricated reinforced concrete construction and trapezoidal sheet metal cladding with 1,600 + 850 m2 of floor...
Extension of the can packaging hall
Principal: Heineken Hungária Sörgyárak Zrt Project: The service included the expansion of the factory hall in the Sopron plant. Due to the larger space requirements of the new can packaging system, the building was expanded to a prefabricated reinforced concrete...
Copyrights © 2019 Stettin Hungaria | Impressum | Privacy Policy | Whistleblowing | Website: Webpole